RIO DE JANEIRO

Our campus in greater Rio de Janeiro provides 60MW total IT load at approximately 20 MW per building.

RIO DE JANEIRO
60MW

total IT Load

2025

Ready for service 

3

Buildings on site 

Multiple buildings 

3 single-story data center buildings.

Network-rich connectivity 

Our carrier neutral campus is situated within close proximity of other major hyperscale data centers.

Power & Efficiency

Features an N +1 UPS Distributed Block redundant 6:5 configuration and N+1 closed loop air-cooled chiller plant.

Rio