DOCKLANDS
UK
Our Docklands campus in London provides 210MW total IT load at approximately 70 MW per building.
210
Total IT load
2027
Ready for service
3
Buildings on site
Multiple buildings
3 eight-story data center buildings.
Network-rich CONNECTIVITY
Our carrier neutral campus is situated within close proximity of other major hyperscale data centers.
Power & Efficiency
Features an N+1 UPS distributed redundant 8:7 configuration and N+1 closed loop chiller plant.